jaw crusher installation

1. Jaw crusher machine is installed by the factory, the user should be checked after the receipt of the jaw crusher machine and eliminate the various problems arising from transport, and then install it.
2. Rack installation, the vertical plane at the end of the level of tolerance of 0.5mm / m, the horizontal level degrees (measured on the spindle) Tolerance of 0.15 mm / m.
3. Comprehensive inspection before starting the jaw crusher machine. The fastening of the fixed parts, each part of the ubrication as well as V-belt tension level is to check the suitability of the like should be the focus.
4. Check the overall circuit after cuting off jaw crusher switch, and a clear sign hanging switchThis jaw crusher is ideal for primary and secondary crushing. With the increase of production, our jaw crusher can greatly reduce the operating costs. And it is of reliability and flexibility. The large feed opening and force-feeding action from the inward and downward eccentric movement of the swing jaw mean that our jaw crusher can increase the capacity. The jaw has a smaller discharge setting, allowing for a higher degree of flexibility with relative equipment. Positive setting adjustment is easy. The jaw crusher has features of simplicity, easy access and low maintenance.
   From this page, you can get the Stone Crusher,Cement Mill,Jaw Crushers,Jaw Rock Crusher,jaw crusher,ball mill ,ball mill,stone crusher,Rotary Kiln,Mineral Processing from Shanghai Minggong Heavy Equipment Co., Ltd. if you are interested in our products,please contact us by E-mail([email protected]) or telphone, thank you.

No Comments Found

Leave a Reply